Double Bubble

Double Bubble

Follow
15 metre Kelsal Tonga Catamaran. 15.2m x 7.1m 1x1m Fibreglass.

Recent Updates

Double Bubble -
Posted:
We are starting to get back that which looks like a boat. All hatches, lockers & lazarettes are in (although slight closing issue on fwd laz) which we figured, Rod will sort it. 1 pulpit & 2 sets of ... Read More
Double Bubble -
Posted:
Well today is the 17th of Dec, the 6th week, the date we were booked in for & hopefully completed. Thats not happening anytime soon, we are effectively waiting for paint to dry & doing jigsaw puzzles ... Read More
Double Bubble -
Posted:
Rod returned to boat at 5am (Zac's team (Spraytech were busy painting, starting at 4 am), then breaked 10 mins later after Rod arrived finishing 2nd coat, all finished by 8.15 this morning. Mast ... Read More
Double Bubble -
Posted:
At Coomera Motor Inn now, tired & greatly disappointed. Thursday was a no go with painting as not enough hours in the day to wet wipe, hose down, re-tape etc, etc, especially after Rod whilst blowing ... Read More
Double Bubble -
Posted:
5th week in shed today, not painting now until Thursday, chasing pin hole "fairies" ergo more sanding! Ripping off all tape & plastic & re-masking. Rod cut off trampoline today much easier to mask ... Read More
Double Bubble -
Posted:
Just finished sanding, for the night!!! Getting very close to no more hand sanding at least. 50 litres of high build epoxy primer went on (4 coats), think we've sanded 25 litres off, fingers are ... Read More
Double Bubble -
Posted:
Day 35, bit of a daunting day with so much to do, on top of all the sanding yet to be done. When we booked into The Boatworks Alana asked how long are you planning to be up, I shrugged & told her the ... Read More
Double Bubble -
Posted:
4th week in shed today, the nightmare continues, but we CAN see the light! After sanding all weekend, getting everything up & covered completely, vacuum deck, cabin top etc & blow off boat, repair ... Read More
Double Bubble -
Posted:
To quote Garry, "Groundhog day", more sanding, who doesn't love hand sanding a 15mtr boat & 16.5mtr mast!!! Still not perfect, so no priming now until Monday, gives us all weekend to sand, bye bye ... Read More
Double Bubble -
Posted:
Day 22, The guys are still hard at it, with lots of hand sanding, more bogging, priming & sanding, the daily merry go round for them! I have now acid washed, wire brushed & removed Sika from roughly ... Read More
Double Bubble -
Posted:
Day 20 in shed & much has been done, the shed has been closed up for spraying, we are now fully cocooned, the mast has been fully sanded, etch primed, undercoated & bogged. All masking has been ... Read More
Double Bubble -
Posted:
Day 16 in wonderland! One really should keep empty rolls of tape, heaven knows how many have been used. I've not mentioned as yet the carnage inside, every internal side of windows had to be taped ... Read More
Double Bubble -
Posted:
Have retired once again under the boat, another day done as we approach our 3rd week in Coomera & 2nd week on the slip! Much has been done, SO MUCH, Col's onto the rigging, all good there, tick ... Read More
Double Bubble -
Posted:
Week 1 in shed, much accomplished. Rods mate Glen kindly came to offer a hand, bringing milk & lunch, removed 32 steps from mast (96 rivets) & cleaned up bases of push/pullpits & staunchions, they ... Read More
Double Bubble -
Posted:
Well day 4 has ended with deck chairs & cold ale under the boat. Jess & Horst worked flat out from 7am (we started @ 6) until 2.30pm with all but windscreens removed. Windows sanded back to trim ... Read More
Double Bubble -
Posted:
Day 3 of hell, ha! Who's idea was this? Have removed all lower windows & nearly finished removing all the sika, 4 to go. Masked everything up including cockpit (boxed in) most winches etc, masked ... Read More
Double Bubble -
Posted:
Day 2, have all pushpits, pullpits, staunchions & bollards removed. No lifeline rails! 4 hatches removed, 2 to go, 2 solar panels removed and what feels like to my fingers a zillion tubes of sika ... Read More
Double Bubble -
Posted:
9.30 kick off this morning, into the slip pen ready for the travel lift to take Double Bubble up out of the water & into the shed (1st time in one), not fighting the elements for the next 6-8 weeks ... Read More
Double Bubble -
Posted:
After lots of stress, humidity & winds this morning Col & Jess arrived from QuinRig & started the process of de-rigging Double Bubble with skipper. Naturally winds started to increase as the time got ... Read More
Double Bubble -
Posted:
Making progress dismantling the boat, sails removed, wiring disconnected, crane booked for 4pm Monday for mast/rig removal (please no wind)! Onto hard Tuesday 9.30 & into the shed. Had lovely catch ... Read More

Weather Reports